- India
- Wind Farm
Sustainable Development Co-Benefits
- Social
- Health & Safety
- Jobs
- Welfare
- Economic
- Energy
- Growth
Purpose of the project activity:
The purpose of this project is to generate environmentally friendly, clean, GHG-emissionfree electricity, which will reduce the overall GHG emissions resulting from conventional electricity generation activities.
Scenario existing prior to the start of the implementation of the project activity:
The project activity forms a part of the NEWNE Grid of India (now part of Unified Indian Grid). The project activity generates power by using the kinetic energy of wind, thus resulting in zero emissions during electricity production. The power produced displaces an equivalent amount of power from the grid, which is generated mainly by fossil fuel fired power plants. Hence, the project activity results in reduction of GHG emissions.
Hence, in the absence of this project activity, this power would be otherwise generated by grid connected fossil fuel based power plants.
Project Scenario:
Wind powered electricity generation is considered environmentally friendly. It replaces some of the fossil fuel dominated electricity generation mix of the current grid and contributes to GHG emission reduction. The project activity generates electricity by using the kinetic energy of flowing wind. There are no GHG emissions during electricity production in this way. The electricity produced displaces an equivalent amount of power from the existing grid, which is currently generated mainly by fossil fuel fired power plants. Hence, it reduces GHG emissions.
Environmental well-being:
The project activity employs renewable energy source for electricity generation which would otherwise been generated by the conventional fossil fuel based power plants. This will reduce the emission of gaseous, liquid and/or solid effluents/wastes.
Project title |
Jangi 91.8 MW wind farm in Gujarat
- project design document (433 KB) PDD appendices Appendix 1 - 6702 IRR Calculation (67 KB) Appendix 2 - 6702 Benchmark Calculation (214 KB) Appendix 3 - 6702 EF Calculation (1072 KB) Appendix 4 - 6702 CER Calculation (10 KB) - registration request form (742 KB) |
---|---|
Host Parties |
India
, involved indirectlyapproval (135 KB)
authorization (135 KB)
Authorized Participants: GP Wind (Jangi) Private Limited |
Other Parties Involved |
Sweden
, involved indirectly
approval (413 KB)
authorization (413 KB)
Authorized Participants: Tricorona Carbon Asset Management Pte Ltd (withdrawn as of 15/02/2021) |
Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
Activity Scale | LARGE |
Standardized baselines used | N/A |
Amount of Reductions | 254,527 metric tonnes CO2 equivalent per annum |
Fee level | USD 49405.4 |
Validation Report |
VVS/VVM version:
VVM 1.2
Validation report (1772 KB) Public availability information Link to information uploaded for public availability | Registration Date | 17 Oct 12 (Date of registration action 10 Jan 13) (view history) completeness check: complete info & rep check: concluded |
Crediting Period |
01 Nov 12 - 31 Oct 22
(Fixed)
Changed from: 01 Jun 13 - 31 May 23 |
Requests for Issuance
and related documentation |
Monitoring report: 01 Nov 2012 - 31 Dec 2013 (206 KB) Issuance request state: Issued CERs requested up to 31 December 2012: 21418 CERs requested from 01 Jan 2013 until 31 December 2020: 202993 Serial Range: Block start: IN-5-204868931-1-1-0-6702 Block end: IN-5-204890348-1-1-0-6702 Serial Range: Block start: IN-5-204890349-2-2-0-6702 Block end: IN-5-205093341-2-2-0-6702 [Full view and history] Monitoring report: 01 Jan 2014 - 31 Dec 2020 (501 KB) (withdrawn) [Full view and history] Monitoring report: 01 Jan 2014 - 30 Apr 2016 (502 KB) Issuance request state: Issued CERs requested from 01 Jan 2013 until 31 December 2020: 458734 Serial Range: Block start: IN-5-273139589-2-2-0-6702 Block end: IN-5-273598322-2-2-0-6702 [Full view and history] Monitoring report: 01 May 2016 - 31 May 2018 (502 KB) Issuance request state: Issued CERs requested from 01 Jan 2013 until 31 December 2020: 441053 Serial Range: Block start: IN-5-272376919-2-2-0-6702 Block end: IN-5-272817971-2-2-0-6702 [Full view and history] Monitoring report: 01 Jun 2018 - 31 Dec 2020 (502 KB) Issuance request state: Issued CERs requested from 01 Jan 2013 until 31 December 2020: 525437 Serial Range: Block start: IN-5-275445522-2-2-0-6702 Block end: IN-5-275970958-2-2-0-6702 [Full view and history] |